Loads got done today. The framework for the L shaped lounge / double bed was made and fitted, the kitchen frame work was fitted after the water pipes and gas pipe was laid under the floor. Glad I check things, for some reason reason I had connected the red water pipe to the cold water supply, lol. Obviously I had done it on purpose (not) to see if Norm would notice.but has he hasn’t today I put it right.
The sliding door was also finished which included insulating it, putting the boards on and the silver screen and fly screen.
A great day
