We had a good day today. Shona dropped me off at Norms at 9.15am and we started work straight away. The foam we had “stuck” to the roof fell down. We have got the ply now and will restick them but immediately plywood them below. The big work today was on the side walls. One side has been totally done with between 32mm and 64mm foam board, rockwall stuck in all gaps, then silver bubble wrapped and finally the plywood that came with her screwed back on. This will then have another layer of silver bubble wrap, this time the reverse way to reflect heat in summer and then a final finish of 3mm maple wall board. We have left two panels on this side without insulation at the moment as this is where the windows will go.
On the other side the front panel is complete and tomorrow we will finish the insulation with the side and back doors and the final back panel
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Before we boarded them up Norm placed some carefully placed strutts. These will really be handy when we fit furniture