The floor is complete. It is now all battoned out and covered with 32mm gyrock foam. Around the edges, in the gaps we then used the sort of stuff you use in the attic. The plywood floor has also been screwed back down and we are now ready to do the ceiling. Its started to take shape.
As a reward we all treated ourselves to a meal at The Yarborough Arms
